Contact us
  Unified Hotline
+86-0512-60883611
ADD:4th Floor, Building F, No. 99 Liuxu Road, Wujiang District, Suzhou City, Jiangsu Province             
TEL :+86-0512-60883611

FAX:+86-0512-60883617

Email:sales@stable.net.cn

Industry news
Current Location:Home - News - Industry news

Notes of the Air Compressor’s Installation

2017-11-06

1.You must install the air compressor in some well-lighted place so that it is convenient to operate and maintain.  


2.The air relative humidity had best be low. And it is dustless , fresh-aired and well-ventilated.


3.The temperature of environment must be lower than 40℃. The higher the environment temperature is, the less air amount compressor  need export. 


4.If the environment of the factory is bad relatively and dusty, install  the pre-filtration equipment.


5.Set apart the passageway and install the overhead travelling crane if condition permitting so as to the maintenance.


6.Set apart the maintenance space. The distance between the air compressor and the wall should be above 70 centimetre.


7.The distance between the air compressor and the top should be above 1 metre. 

HOME | PRODUCT | ABOUT | NEWS | QUALIFICATION | CONTACT


Stable  Copyright © 2016 www.Stable.net.cn All Rights Reserved 沪ICP备12004668号-1By:TOFEI